Exhaust fan detection

 Texting Products    |      2024-01-02 10:19:24

How to handle the report for testing products? The third-party testing agency of Baijian.com can provide customers with reporting and certification quality inspection services. Baijian.com has numerous cooperative laboratories, which provide authentic and effective reports and certifications, covering CNAS, CMA, CAL, etc. We provide you with relevant industry testing services

Sample size: choose to send samples or visit according to the sample size

Display style: electronic version

Testing cycle: 3-15 working days (can be expedited)

Testing items:

General structure, usage environment, startup, noise, appearance, lifespan, input power, output air volume, isolation mechanism action operation test, long-term operation test, air volume test, wet heat test for coated parts, salt spray test for electroplated parts.

, General inspection, noise test, start-up test, input power test, installation size, rated parameters, specifications, type

Testing standards:

1. Exhaust fan GB/T23174-20085.1

2. Exhaust fan GB/T23174-20085.8

3. GB/T 23174-2008 Exhaust fan GB/T 23174-2008

4. GB/T 23174-2008 Exhaust fan 5.6

5 Exhaust Fan GB/T23174-20085.7

6. Exhaust Fan GB/T23174-20085.6

7. Exhaust Fan GB/T23174-20085.5

8. Exhaust Fan GB/T23174-20085.4

9. Exhaust Fan GB/T23174-20085.3

10 Exhaust Fan GB/T23174-20085.2

Testing Process

1. Send Samples

2. Check Requirements

3. Targeted Quotation

4. Both parties confirm and sign the contract to start the experiment

5. Complete the experiment: The testing cycle (can be expedited) may change according to the sample and its testing items/methods, and can consult engineers

6. Issue a testing report and provide post service