Resistance to liquid media

 Texting Products    |      2023-12-29 13:26:13

Which company should I go to for liquid medium resistance testing? Baijian.com is a comprehensive collective owned research institute that integrates testing, inspection, analysis, testing, technical consulting, and other services with CMA and other qualifications recognized by the national metrology certification. It can also carry out testing projects such as resistance to liquid media. It has been rated as a national high-tech enterprise and can issue testing reports within 7-15 working days Testing items: Resistance to liquid media testing, etc Testing Standard

GB/T 1690-2010 Test Method for Liquid Resistance of Vulcanized Rubber or Thermoplastic Rubber

GB/T 5720-2008 Test Method for O-shaped Rubber Seals

GB/T 9274-1988 Paints and Varnishes Determination of Liquid Resistance

GB/T 11547-2008 Plastics Determination of Liquid Resistance to Chemical Reagents

GB/T 20671.3-2020 Classification System and Test Methods for Non metallic Gaskets Materials Part 3: Test Method for Liquid Resistance of Gaskets Materials

GB/T 2413 GB/T 30648.1-2014 Paints and Varnishes Determination of Liquid Resistance Part 1: Immersion in Liquids Other than Water

GB/T 30648.2-2015 Paints and Varnishes Determination of Liquid Resistance Part 2: Immersion Method

GB/T 30648.3-2015 Paints and Varnishes Determination of Liquid Resistance Part 3: Method using Absorbing Media

GB/T 30648.4-2015 Paints and Varnishes Resistance Determination of Liquidity Part 4: Droplet Method

Detection Process

1. Baijianwei has received a commission from the customer 2. Both parties confirm the service requirements 3. Engineers provide quotations 4. The customer sends samples in the early stage, and BAIJIAN receives the samples 5. Engineers number and organize the samples 6. Both parties shall determine the testing items and sign a confidentiality agreement 7. Assign personnel to the laboratory, establish a team, and arrange testing projects. Having the national high-tech enterprise certificate and CMA testing qualification certificate, with complete testing instruments, the testing report can be issued within 7-15 days Complete the experiment within 8-15 working days 9. The engineer integrates the test results and data, and issues a testing report 10. Send the report to the customer by mail, fax, email, etc 11. Engineers provide follow-up related services