12kV-40.5kV high-voltage vacuum circuit breaker detection

 news    |      2024-01-16 14:35:03

How to handle the testing report of the sample? What are the scope and standards of testing? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs

Display style: electronic version

Testing cycle: 3-15 working days (can be expedited)

Report qualifications: CNAS, CMA, CAL, etc.

Testing items:

Out of step breaking and closing test, breaking and closing, out of phase grounding and electrical life test, breaking and closing capacitor group test, breaking and closing circuit charging current test, breaking and closing cable line test, breaking and closing motor test, breaking and closing reactor test.

, Breaking and closing inductive small current test, short-term and peak withstand current test

Detection standards:

1. DL/T 403-2017 high-voltage AC vacuum circuit breaker 6.16

2. DL/T 403-2017 high-voltage AC vacuum circuit breaker DL/T 403-2017

Detection process steps

1. Telephone communication and confirmation of requirements 2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required