How to handle the testing report of the sample? What are the scope and standards of testing? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs p>
Report qualifications: CNAS, CMA, CAL, etc.
Testing costs: quoted based on customer needs and experimental complexity
Sample size: selected for sending or visiting based on sample size
Display style: electronic version
Testing cycle: 3-15 working days (expedited)
Testing items:
Overvoltage test, temperature test, deformation test, tensile test, power test, leakage current test, appearance and size measurement.
, Over temperature protection performance test, flushing test, grounding resistance test, noise test, thermal inertia test, starting current test, flame retardant test, dielectric strength test, low temperature test, insulation resistance testTesting standards:
1. TB/T 2704-2016 Railway Passenger Car Electric Warmer
2. TB/T 2704-2016 Railway Passenger Car Electric Warmer TB/T 2704-2016
Testing process steps
1. Telephone communication and confirmation of requirements p> 2. Recommend solutions and confirm quotations p> 3. Mail samples and arrange testing p> 4. Progress tracking and result feedback p> 5. Provide reports and after-sales service p> 6. If urgent or priority processing is required P>