Parameter detection of box type foot warmer

 news    |      2024-01-16 14:34:25

Baijian Testing is a third-party testing agency that provides enterprises with relevant CNAS, CMA, CAL and other qualification certification testing reports. We always take the enterprise as the first and customer as the center, carry out testing work under strict procedures, provide customers with product testing and quality control solutions, and wholeheartedly provide scientific and scientific inspection, research and development analysis services for our customers

Report qualifications: CNAS, CMA, CAL, etc.

Testing costs: quoted based on customer needs and experimental complexity

Sample size: selected for sending or visiting based on sample size

Display style: electronic version

Testing cycle: 3-15 working days (urgent)

Testing items:

Moisture resistance, markings and instructions, protection against touching live parts, input power, heating, leakage current and electrical strength at working temperature.

, Leakage current and electrical strength, abnormal operation, stability and mechanical hazards, mechanical strength, structure, internal wiring, power connections and external flexible wires, connection terminals for external wires, grounding measures, screws and connections, electrical clearances, creepage distance and solid insulation, heat and fire resistance, rust prevention

Testing standards:

1. DB43/T 873-2014 box type foot warmer

2 DB 43/T873-2014 "Box style Foot Warmer" DB 43/T873-2014

Test report function:

1. Project bidding: issue authoritative third-party CMA/CNAS qualification report 2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to reassure consumers 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production process problems