Testing of arc welding equipment with limited load

 news    |      2024-01-16 09:14:41

Baijian Testing is a third-party testing agency that provides enterprises with relevant CNAS, CMA, CAL and other qualification certification testing reports. We always take the enterprise as the first and customer as the center, carry out testing work under strict procedures, provide customers with product testing and quality control solutions, and wholeheartedly provide scientific and scientific inspection, research and development analysis services for our customers

Report qualifications: CNAS, CMA, CAL, etc.

Testing costs: quoted based on customer needs and experimental complexity

Sample size: selected for sending or visiting based on sample size

Display style: electronic version

Testing cycle: 3-15 working days (expedited)

Testing items:

All parameters, dielectric strength, continuity of protective circuit, tilt stability, heat test, shell, shell protection, lifting device.

, Contact current test under fault conditions, thermal protection device action ability, creepage distance, capacitor discharge test, electrical clearance, cable fixing device, short circuit test, insulation resistance, load test, drop, isolation between input circuit and welding circuit, input circuit on/off device, input cable, nameplate, rated no-load voltage, fan stall test

Detection standards:

1 IEC 60974-6:2015 EN 60974-6:2016 Arc Welding Equipment Part 6: Load Limiting Arc Welding Equipment IEC 60974-6:2015 EN 60974-6:2016

2. IEC 60974-6:2015 Arc Welding Equipment Part 6: Load Limiting Equipment

3. GB/T 15579.6-2018 Arc Welding Equipment Part 6: Load Limiting Equipment

4. IEC 60529:1989+A1:1999+A2:2013 Housing Protection Level

5 IEC 60974-6:2015 EN 60974-6:2016 Arc welding equipment Part 6: Arc welding equipment with limited load 6.1.5

6, IEC 60974-6:2015 EN 60974-6:2016 Arc Welding Equipment Part 6: Load Limiting Equipment 6.3.6

7. IEC 60974-6:2010 Arc Welding Equipment Part 6: Load Limiting Equipment

Testing Process

1. Sending Samples

2. Checking Requirements

3. Targeted Quotation

4. Both parties confirm, sign a contract, start the experiment

5. Completing the experiment: The testing cycle (can be expedited) may vary depending on the sample and its testing items/methods, Consulting engineers

6. Provide testing reports and post service