How to handle the testing report of the sample? What are the scope and standards of testing? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs p>
Report qualifications: CNAS, CMA, CAL, etc.
Testing costs: quoted based on customer needs and experimental complexity
Sample size: selected for sending or visiting based on sample size
Display style: electronic version
Testing cycle: 3-15 working days (can be expedited)
Testing items:
Refrigeration consumption, all items, comprehensive refrigeration performance coefficient, refrigeration capacity
Testing standards:
1 GB 21454-2008 All Projects
2. GB21454-2008 Multi unit Air Conditioning (Heat Pump) Unit Energy Efficiency Limits and Energy Efficiency Grades
Testing Process
1. Sending Samples
2. Checking Requirements
3. Targeted Quotation
4. Both parties confirm, sign a contract, start the experiment
5. Completion of the experiment: The testing cycle (can be expedited) may vary depending on the sample and its testing items/methods, and can be consulted with an engineer
6 Provide testing reports and provide post service P>