How to process the testing report? What are the testing items and standards? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs

Testing process

1. Sending samples

2. Checking requirements

3. Targeted quotation

4. Both parties confirm, sign a contract, and start the experiment

5. Completing the experiment: The testing cycle (can be expedited) may change according to the sample and its testing items/methods, and engineers can be consulted

6. Issuing the testing report and providing post service.

Testing items:

Low temperature test, impact and vibration test, flushing test, cold dielectric strength, power test, deformation test, starting current test, noise test, appearance and size inspection, tensile test, grounding resistance test, leakage current test, temperature test, wet and hot dielectric strength test, thermal inertia test, weighing test, insulation resistance test, aging test, over temperature protection performance test, overvoltage test, insulation material inspection, flame retardant test.

, Air volume test, high-voltage circuit leakage current measurement, high-altitude matching test

Detection standards:

1. TJ/CL 496-2016 Temporary technical conditions for electric heaters of high-speed trains TJ/CL 496-2016

2. TB/T 2704-2016 Railway passenger and high-speed train electric heaters 6.10

3. TB/T 2704-2016 Railway passenger and high-speed train electric heaters TB/T 2704-2016

4. TJ/CL 496-2016 Temporary technical conditions for electric heaters of high-speed trains

5 TJ/CL 496-2016 Temporary Technical Conditions for Electric Heaters of EMUs 6.13

Testing Process

1. Send Samples

2. Check Requirements

3. Targeted Quotation

4. Both parties confirm and sign a contract to start the experiment

5. Complete the experiment: The testing cycle (may be expedited) may change according to the sample and its testing items/methods, and engineers can be consulted

6. Issue a testing report and provide post service