Electric washing machine -1 inspection

 news    |      2024-01-12 09:35:10

How to handle the testing report of the sample? What are the scope and standards of testing? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs

Display style: electronic version

Testing cycle: 3-15 working days (urgent)

Report qualifications: CNAS, CMA, CAL, etc.

Testing items:

Rinsing performance, all items, dehydration performance, water consumption, washing ratio, power consumption, all parameters

Testing standards:

1. GB 12021.4-2013 Water Consumption

2. GB 12021.4-2013 Electric Washing Machine Energy Consumption and Water Efficiency Limit Values and Grades

3. GB 4706.24-2008 IEC 60335-2-7:2008 (Ed7.0) "Special requirements for the safety of household and similar electrical appliances - Washing machines"

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs 2. Fully cover the laboratory and allocate localized testing nearby

3. Engineer one-on-one service to make testing more accurate

4. Free initial inspection, no testing fee charged for initial inspection

5. Self service ordering and express delivery for free on-site sampling 6. Short cycle, low cost, and thoughtful service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative, effective, and universally applicable domestically