Liquid heater parameter detection

 news    |      2024-01-12 09:34:50

How to process the testing report? What are the testing items and standards? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs

Sample size: Choose to send or visit based on sample size

Display style: electronic version

Testing cycle: 3-15 working days (can be expedited)

Testing items:

Input current, internal wiring, structure, leakage current and electrical strength, leakage current and electrical strength at working temperature, heat and flame resistance, electrical strength, input power and current, electrical clearance, creepage distance and solid insulation, moisture resistance.

, Overload protection, stability and mechanical hazards, mechanical strength, rust prevention, abnormal operation, input power and power deviation, grounding measures, external wire terminals, protection against contact with live parts, screws and connections, markings and instructions, power connections and external flexible wires, heating, some parameters

Testing standards:

1. IEC 60335-2-15:2012/AMD2:2018; EN 60335-2-15:2016/A11:2018; GB 4706.19-2008 Household and similar equipment - Special requirements for liquid heaters IEC 60335-2-15:2012/AMD2:2018; EN 60335-2-15:2016/A11:2018; GB 4706.19-2008

2. GB4706.19-2008 Safety of household and similar electrical appliances - Special requirements for liquid heaters

3. GB 4706.19-2008 "Safety of household and similar electrical appliances - Part 2: Special requirements for liquid heaters" GB4706.19-2008

4. IEC 60335-2-15:2012/AMD2:2018; EN 60335-2-15:2016/A11:2018; GB 4706.19-2008 Household and similar equipment - Special requirements for liquid heaters/

100% inspection process:

1. Telephone communication and confirmation of requirements 2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required