Washing machine (energy efficiency) testing

 news    |      2024-01-12 09:34:48

How to handle the testing report of the sample? What are the scope and standards of testing? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs

Report qualifications: CNAS, CMA, CAL, etc.

Testing costs: quoted based on customer needs and experimental complexity

Sample size: selected for sending or visiting based on sample size

Display style: electronic version

Testing cycle: 3-15 working days (expedited)

Testing items:

All parameters, shutdown power, standby power, minimum energy efficiency standard value MEPS, signs and instructions, labels and grading, water consumption and cleaning ratio.

, Indicating allowable deviations, water efficiency level, energy efficiency level, all items

Testing standards:

1. GB 12021.4-2013 Electric Washing Machine Energy Efficiency Water Efficiency Limit and Level GB 12021.4-2013

2. GB 12021.4-2013 Electric Washing Machine Energy Efficiency Water Efficiency Limit and Level 4.2

3. GB 12021.4-2013 Water Consumption and Cleanliness Ratio

4. JJF 1261.8-2017 Electric Washing Machine Energy Efficiency Identification Measurement and Testing Rules

5 SASO 2885:2018 Electric Washing Machine - Requirements and Labels for Energy Efficiency and Water Consumption Performance SASO 2885:2018

6. SASO 2885:2018 Electric Washing Machine - Requirements and Labels for Energy Efficiency and Water Consumption Performance

7. GB 12021.4-20134.1.1 Energy Efficiency Level

8. GB 12021.4-20134.1.2 Water Efficiency Level

9. GB 12021.4-20134.1.3 Explicit Value Tolerance

100% Inspection Process:

1. Telephone communication and confirmation of requirements 2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required