Safety level transformer inspection for pressurized water reactor nuclear power plants

 news    |      2024-01-11 10:37:07

Baijian Testing is a third-party testing agency that provides enterprises with relevant CNAS, CMA, CAL and other qualification certification testing reports. We always take the enterprise as the first and customer as the center, carry out testing work under strict procedures, provide customers with product testing and quality control solutions, and wholeheartedly provide scientific and scientific inspection, research and development analysis services for our customers

Report qualifications: CNAS, CMA, CAL, etc.

Testing costs: quoted based on customer needs and experimental complexity

Sample size: selected for sending or visiting according to sample size

Testing items:

Sound level measurement, external voltage resistance test, induced voltage resistance test, weather test (thermal shock test), temperature rise test, thermal life assessment test, environmental test, voltage ratio measurement and connection group label verification, short circuit test, short circuit impedance and load loss measurement, no-load loss and no-load current measurement, winding DC resistance measurement, insulation resistance measurement, long-term operation test

Testing standards:

1. NB/T 20081-2012 Safety Level Transformer Identification Regulations for Pressurized Water Reactor Nuclear Power Plants 5.3.6

2. NB/T 20081-2012 Safety Level Transformer Identification Regulations for Pressurized Water Reactor Nuclear Power Plants NB/T 20081-2012

Baijia.com is a comprehensive testing service platform that gathers numerous CNAS, CMA, CAL and other qualification testing institutions across the country. For more testing needs, please contact Baijia.com for consultation.