Electrical performance testing

 news    |      2024-01-11 10:22:15

Baijian Testing is a professional third-party testing organization that provides relevant component testing and testing. It has a short cycle, excellent price, and issues national certification qualification reports. Display style: electronic version. Testing cycle: 3-15 working days (urgent). Testing qualifications: CNAS, CMA, CAL, etc. Testing items: single wire resistivity, current carrying capacity, joint conductivity test, stranded wire DC resistance, DC resistance, temperature rise test, temperature rise mechanical strength test, steel aluminum conductivity test, resistance test, continuous current carrying capacity allowable maximum temperature test, contact resistance test, electrical resistance test, heat resistance test, and heat resistance test. Flammability and leakage resistance, marking, grounding device, electrical performance, single line resistivity or conductivity, indoor current carrying capacity, inductance, electrical continuity test, current carrying temperature rise test, conductivity, performance test, insulation resistance, box electrical performance, terminal balance return loss and stable loss, interface impedance return loss, unbalanced impedance to ground, input and output relative level, insulation electrical strength test, insulation resistance test, shielding layer electrical performance, 5. Electrical performance, system electrical performance, AC voltage resistance, voltage resistance test, grounding resistance, light attenuation, fiber length, Attenuating Far End Crosstalk Ratio Power Sum (PS ACR-F), Attenuating Far End Crosstalk Ratio (ACR-F), Attenuating Near End Crosstalk Ratio Power Sum (PS ACR-N), Attenuating Near End Crosstalk Ratio (ACR-N), Near End Crosstalk Power Sum (PS NEXT), Near End Crosstalk (NEXT), DC Loop Resistance, Propagation Delay Deviation, Propagation Delay, Echo Loss, Insertion Loss, Length, Connection Diagram, Combustion Performance, Insulation Thickness, All Items, Near End Crosstalk, Far End Crosstalk, Wiring Diagram

Testing Standards:

1. JB/T10216-2013 Electrical Control and Distribution Cable Tray

2. YD/T 1313-2008 Integrated Distribution Box for Broadband Access

3. T/CECS31:2017 Technical Specification for Steel Cable Tray Engineering

4. GB 50339-2013 Quality Acceptance Specification for Intelligent Building Engineering GB50339-2013

5. YD/T1436-2014 Outdoor Communication Power Supply System

6. TB/T 3111-2017 Single Line Resistivity or Conductivity

7. QB/T1453-2003 Cable Tray

8. YD/T 1437-2014 Digital Distribution Frame

9. YD/T 740-95 Communication Cable Distribution Box

10. TB/T 3252-2022 Contact Resistance Test

11. TB/T2809-2017 Copper and Copper Alloy Contact Wire for Electrified Railways

12 GB/T12971.4-1991 Contact Wire for Electric Traction Part 4: Steel, Aluminum, and Aluminum Alloy Composite Contact Wire

13, GB/T 1179-2008 Single Wire Resistivity or Conductivity

14, YD/T 1436-2014 Outdoor Communication Power Supply System

15, GB/T1179-2017 Round Wire Concentric Twisted Hollow Wire

16, OCS-2-2010 Current Carrying Temperature Rise Test

17, TB/T3111-2017 Copper and Copper Alloy Stranded Wire for Electrified Railways

18, YD/T 881-1996 Technical Conditions for Communication Cable Distribution Boxes

19. QB/T 1453-2003 Electrical Continuity Test

20. GB/T12971.5-1991 Contact Wire for Electric Traction Part 5: Aluminum Alloy Composite Contact Wire

Testing Process

1. Send Samples

2. Check Requirements

3. Targeted Quotation

4. Both parties confirm and sign a contract to start the experiment

5. Completion of the experiment: The testing cycle (can be expedited) may vary depending on the sample and its testing items/methods, and can be consulted with an engineer

6. Issue a testing report and provide post service