How to handle the report for testing products? The third-party testing agency of Baijian.com can provide customers with reporting and certification quality inspection services. Baijian.com has numerous cooperative laboratories, which provide authentic and effective reports and certifications, covering CNAS, CMA, CAL, etc. We provide you with relevant industry testing services
Sample size: choose to send samples or visit according to sample size
Display style: electronic version
Testing cycle: 3-15 working days (urgent)
Testing items:
All parameters, freezing test, condensate discharge capacity test, condensation test, refrigeration consumption power, refrigeration system sealing performance test, refrigeration comprehensive performance coefficient test, refrigeration capacity test, heating consumption power rate test.
, Comprehensive performance coefficient test for heating, heating capacity test, noise test, indoor mechanism cooling capacity test, indoor mechanism heating capacity test, indoor unit minimum operating cooling test, indoor unit consumption power test, maximum operating cooling test, maximum operating heating test, minimum operating heating test, unit shunt imbalance rate test, coating adhesion test for painted parts, salt spray test for electroplated parts, automatic defrosting test, auxiliary electric heating device heating consumption power test, Operation test, freezing test, condensate and condensate discharge test, refrigeration capacity, heating capacity, shell freezing test, maximum refrigeration test, maximum heating test, minimum refrigeration test, minimum heating test, heat recovery capacity, automatic defrosting test, rated refrigeration capacity, rated heat capacityTesting standards:
1. GB/T25857-2010cl.63.19 noise test
2. GB/T25857-2010cl.63.18 automatic defrosting test
3 GB/T25857-2010cl.6.3.4 Refrigeration Consumption Power
4. GB/T25857-2010cl.6.3.15 Freezing Test
5. GB/T25857-2010cl.6.3.14 Minimum Operating Heating Test
6. GB/T25857-2010cl.6.3.3 Refrigeration Capacity Test
7. GB/T25857-2010cl.6.3.17 Condensation Discharge Capacity Test
8. GB/T25857-2010cl.6.3.2 Operating Test
9. GB/T25857-2010cl.6.3.1 Refrigeration System Sealing Performance Test
10 GB/T25857-2010cl.6.3.16 Condensation Test
11, GB/T25857-2010cl.6.3.11 Maximum Operating Refrigeration Test
12, GB/T25857-2010cl.6.3.10 Indoor Mechanism Heat Test
13, GB/T2587-2010cl.6.3.13 Indoor Unit Minimum Operating Refrigeration Test
14, GB/T25857-2010cl.6.3.12 Maximum Operating Heating Test
15, GB/T2587-2010cl.6.3.8 Indoor Mechanism Cooling Capacity Test
16 GB/T25857-2010cl.6.3.7 Auxiliary Electric Heating Equipment Heating Consumption Power Test
17, GB/T25857-2010cl.6.3.6 Heating Consumption Power Test
18, AS/NZS 3823.1.4:2012 Electrical Performance Air Conditioners and Heat Pumps Part 1.4: Multi unit Air Conditioning and Air to Air Heat Pumps - Performance Testing and Rating Clause 6.5
19, GB/T25857-2010cl.6.3.5 Heating Capacity Test
20 ISO 15042:2017 Multi unit Air Conditioning and Air to Air Heat Pump - Performance Testing and Rating Clause 6.4
Baijian.com is a comprehensive testing service platform that gathers numerous CNAS, CMA, CAL and other qualified testing institutions across the country. For more testing needs, please contact Baijian.com for consultation P>