Sulfurization characteristics

 Texting Products    |      2024-01-10 09:40:17

Which company does the vulcanization characteristic test go to? Baijian.com is a comprehensive collective owned research institute that integrates testing, inspection, analysis, testing, technical consulting, and other services with CMA and other qualifications recognized by the national metrology certification. It is also rated as a national high-tech enterprise and can issue testing reports within 7-15 working days Testing items include vulcanization characteristic testing, etc Test standard

GB/T 1233-2008 Unvulcanized rubber Determination of initial vulcanization characteristics Using a disc shear viscometer

GB/T 8656-2018 Evaluation method for lotion and solution polymerized styrene butadiene rubber (SBR)

GB/T 8660-2018 Solution polymerized butadiene rubber (BR) Evaluation Method

GB/T 9869-2014 Determination of Vulcanization Characteristics of Rubber Materials - Disc Oscillating Vulcanizer Method

GB/T 16584-1996 Rubber - Determination of Vulcanization Characteristics using a Rotorless Vulcanizer

GB/T 21462-2008 Evaluation Method for Chlorobutadiene Rubber (CR)

GB/T 30918-2014 Evaluation Method for Non oil extended Solution Polymerized Isoprene Rubber (IR)

GB/T 32676-2016 Halogenated Isobutene Isoprene Rubber (BIIR and CIIR) Evaluation Method

GB/T 34685-2017 Acrylonitrile Butadiene Rubber (NBR) Evaluation Method

Testing Process

1. Baijia.com has received a commission from the customer 2. Both parties confirm the service requirements 3. Engineers provide quotations 4. The customer sends samples in the early stage, and BAIJIAN receives the samples 5. Engineers number and organize the samples 6. Both parties shall determine the testing items and sign a confidentiality agreement 7. Assign personnel to the laboratory, establish a team, and arrange testing projects. Having the national high-tech enterprise certificate and CMA testing qualification certificate, with complete testing instruments, the testing report can be issued within 7-15 days Complete the experiment within 8-15 working days 9. The engineer integrates the test results and data, and issues a testing report 10. Send the report to the customer by mail, fax, email, etc 11. Engineers provide follow-up related services