How to handle the testing report of the sample? What are the scope and standards of testing? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs p>
Testing process
1. Sending samples
2. Checking requirements
3. Targeted quotation
4. Both parties confirm, sign a contract, and start the experiment
5. Completing the experiment: The testing cycle (can be expedited) may change according to the sample and its testing items/methods, and engineers can be consulted
6. Issuing the testing report and providing post service.
p>Testing items:
Low temperature test, circuit resistance measurement, partial discharge measurement, power frequency withstand voltage test, mechanical test, temperature rise test, humidity test, lightning impulse voltage test, high temperature test, IP code inspection, measurement of main circuit resistance, power frequency voltage test, mechanical operation test at room temperature, mechanical impact test, mechanical characteristic test, creepage distance, design and appearance inspection, voltage test of auxiliary and control circuits, protection level inspection, temperature rise test/continuous current test, additional test of auxiliary and control circuits, AC withstand voltage test, measurement of dielectric loss angle tangent value, use of remote operating devices to check the operation of the operating mechanism, measurement of conductive circuit resistance, and closing time of circuit breakers Check the minimum operating voltage of the closing contactor and opening solenoid of the operating mechanism, determine the leakage current, measure the insulation resistance and DC resistance of the closing contactor and opening solenoid coil, measure the simultaneity of the circuit breaker contacts opening and closing, and measure the parallel resistance, parallel capacitance, and parallel capacitance tg of the arc extinguishing chamber δ (%), Insulation Resistance Measurement
Testing Standards:
1. GB/T 16927.1-2011, IEC60060-1:2010 High Voltage Testing Techniques Part 1: General Definitions and Test Requirements GB/T 16927.1-2011, IEC60060-1:2010
2. GB/T 1984-2014 High Voltage AC Circuit Breakers GB/T 1984-2014
3. GB/T 1984-2014.7.1 Power Frequency Voltage Test
4. GB/T 1984-2014.7.3 Lightning Impulse Voltage Test
5. GB/T 3309-1989 "Mechanical Testing of High Voltage Switchgear at Room Temperature" GB/T 3309-1989
6. GB/T 1984-2046.101.2 Mechanical Operation Test at Room Temperature7. GB/T 1984-2046.101.1 Mechanical Characteristics Test
8. GB/T 3309-1989 "Mechanical Testing of High Voltage Switchgear at Room Temperature" 3.1.1, 3.1.2
9. GB/T 16927.1-2011, IEC60060-1:2010 High Voltage Testing Technology Part 1: General Definitions and Test Requirements 6
10. DL/T 402-2016 High Voltage AC Circuit Breakers DL/T 402-2016
11. GB/T 1984-2017.3 Measurement of Main Circuit Resistance
12. IEC 62271-100:2008+AMD1:2012+AMD2:2017 High voltage switchgear and control equipment Part 100: AC circuit breakers 6.413 GB/T 1984 20147.2 Voltage Testing for Auxiliary and Control Circuits
14, IEC 60270:2000+AMD1:2015 High Voltage Testing Techniques Partial Discharge Measurement IEC60270:2000+AMD1:2015
15, IEC 62271-100:2008+AMD1:2012+AMD2:2017 High Voltage Switchgear and Control Equipment Part 100: AC Circuit Breakers 6.101.3.3
16, GB/T 1984 20146.7 Protection Level Inspection
17, GB/T 7354-2018 High Voltage Testing Techniques Partial Discharge Measurement GB/T 7354-2018
18, IEC 62271-100: 2021 High Voltage Switchgear and Control Equipment Part 100: AC Circuit Breakers IEC62271-100:2021
19, GB 1984-2014 AC High Voltage Circuit Breakers GB1984-2014
20, GB/T1984-2014 High Voltage AC Circuit Breakers 6.101.3.3
Testing Process Steps
1. Telephone communication and confirmation of requirements p> 2. Recommend solutions and confirm quotations p> 3. Mail samples and arrange testing p> 4. Progress tracking and result feedback p> 5. Provide reports and after-sales service p> 6. If urgent or priority processing is required P>