How to handle the report for testing products? The third-party testing agency of Baijian.com can provide customers with reporting and certification quality inspection services. Baijian.com has numerous cooperative laboratories, which provide authentic and effective reports and certifications, covering CNAS, CMA, CAL, etc. We provide you with relevant industry testing services
Report qualifications: CNAS, CMA, CAL, etc.
Display style: electronic version
Testing cycle: 3-15 working days (can be expedited)
Testing cost: quoted based on customer needs and experimental complexity
Sample size: selected for sending or visiting based on sample size
Testing items:
Usage instructions, signs, some parameters, PM10 concentration, TVOC concentration, purification energy efficiency, standby power, microbial removal, clean air volume, cumulative purification volume, ozone concentration, sterilization function, ozone concentration Concentration, TVOC concentration, PM10 concentration, noise
Detection standards:
1. GB/T18801-2015.7, 6.10 air purifiers
2. GB/T18801-2015.1, 6.4 air purifiers
3. GB/T 18801-20155.6 Noise
4. GB/T 18801-2015 air purifiers GB/T 18801-2015
5. Appendix A of GB21551.3-2010: Special requirements for antibacterial, sterilizing, and purification functions of air purifiers for household and similar electrical appliances
6. GB/T 18801-2015 2015 Air Purifier 5.5
7. GB/T 18801-20155.5 Instructions for Use
8. GB/T 18801-2015 Air Purifier 5.1, 6.4
9 GB 21551.3-2010 Special Requirements for Antibacterial, Sterilizing, and Purification Function Air Purifiers of Household and Similar Electrical Appliances 5.1.2
10. GB21551.3-2010 5.1.2, 5.1.4, 5.1.5 Special Requirements for Antibacterial, Sterilizing, and Purification Function Air Purifiers of Household and Similar Electrical Appliances
Testing Process
1. Sample sending
2. Check the requirements
3. Targeted quotation
4. Both parties confirm and sign a contract to start the experiment
5. Completion of the experiment: The testing cycle (can be expedited) will be based on the sample and its testing. There may be changes in the project/method, and engineers can be consulted
6. Provide testing reports and post service P>