How to process the testing report? What are the testing items and standards? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs p>
Report qualifications: CNAS, CMA, CAL, etc.
Testing costs: quoted based on customer needs and experimental complexity
Sample size: selected for sending or visiting based on sample size
Display style: electronic version
Testing cycle: 3-15 working days (can be expedited)
Testing items:
General structure, pitch angle adjustment, usage environment, startup, noise, appearance, lifespan, shaking head mechanism, guide wheel and rotating mechanism, energy efficiency value, speed regulation, Rated parameters, air volume, partial parameters, all parameters, input power, all items
Testing standards:
1. QB/T5262-2018Cl.5.4 DC fan
2. QB/T5262-2018Cl.5.3 DC fan
3. QB/T5262-2018Cl.5.6 DC fan
4. QB/T5262-2018Cl.5.5 DC fan
5. QB/T5262-2018Cl.5.8 DC fan
6. QB/T5262-2018Cl.5.7 DC fan
DC fan7 QB/T5262-2018Cl.5.9 DC Fan
8, QB/T 5262-2018 DC Fan Cl. 5.9
9, QB/T5262-2018Cl.5.2 DC Fan
10, QB/T5262-2018Cl.5.1 DC Fan
11, QB/T 5262-2018 DC Fan QB/T 5262-2018
12, QB/T5262-2018 DC Fan
13, QB/T5262-2018Cl.5.10 DC Fan
14, QB/T5262-2018Cl.5.11 DC Electric Fan
15 QB/T5262-2018Cl.5.12 DC electric fan
100% inspection process:
1. Telephone communication and confirmation of requirements p> 2. Recommend solutions and confirm quotations p> 3. Mail samples and arrange testing p> 4. Progress tracking and result feedback p> 5. Provide reports and after-sales service p> 6. If urgent or priority processing is required P>