Which company is responsible for testing the impact performance of shotgun bags? Baijian.com is a comprehensive collective ownership research institute that integrates testing, inspection, analysis, testing, technical consulting, and other services with CMA and other qualifications recognized by the national metrology certification. It can conduct testing projects such as shotgun bag impact performance testing. It has also been rated as a national high-tech enterprise and can issue testing reports within 7-15 working days Testing items include impact performance testing of shotgun bags, etc Testing standards GB/T 328.24-2007 Test methods for building waterproofing membranes Part 24: Impact resistance of asphalt and polymer waterproofing membranes GB/T 1043.1-2008 Determination of impact performance of plastic simply supported beams Part 1: Non instrumented impact test GB/T 1043.2-2018 Determination of impact performance of plastic simply supported beams Part 2: Instrumented impact test GB/T 1732-1993 Determination of impact resistance of paint films GB/T 4893.9-2013 Furniture Surface paint film physical and chemical performance tests - Part 9: Determination of impact resistance - GB/T 6109.7-2008 enameled round winding wires - Part 7: 130L grade polyester enameled copper round wires - GB/T 7670-2009 Electric vibration generation system (equipment) Performance characteristics

GB/T 7990-2013 Test Method for Mechanical Impact Resistance of Glass Lined Layers

GB/T 7991.4-2019 Test Method for Glass Lined Layers Part 4: Determination of Mechanical Impact Resistance

GB/T 8809-2015 Test Method for Pendulum Impact Resistance of Plastic Films

Testing Process

1. Baijiawang has received a commission from the customer 2. Both parties confirm the service requirements 3. Engineers provide quotations 4. The customer sends samples in the early stage, and BAIJIAN receives the samples 5. Engineers number and organize the samples 6. Both parties shall determine the testing items and sign a confidentiality agreement 7. Assign personnel to the laboratory, establish a team, and arrange testing projects. Having the national high-tech enterprise certificate and CMA testing qualification certificate, with complete testing instruments, the testing report can be issued within 7-15 days Complete the experiment within 8-15 working days 9. The engineer integrates the test results and data, and issues a testing report 10. Send the report to the customer by mail, fax, email, etc 11. Engineers provide follow-up related services