Socket switch leakage protector leakage circuit breaker detection

 Texting Products    |      2024-01-05 10:09:20

How to process the testing report? What are the testing items and standards? Today, the editor of Baijian Testing will take you to understand the specific tests required for the relevant testing business. At the same time, Baijian can also design testing plans based on corresponding testing standards or according to your needs

Report qualifications: CNAS, CMA, CAL, etc.

Display style: electronic version

Testing cycle: 3-15 working days (can be expedited)

Testing cost: quoted based on customer needs and experimental complexity

Sample size: selected for sending or visiting based on sample size

Testing items:

Mechanical strength, action characteristics, abnormal heat resistance, abnormal heat and flame resistance, impact performance, Action characteristics (action current, action time), signs, appearance, pull-out force, signs, rated voltage and current, resistance to abnormal heat/fire, resistance to abnormal heat and fire, action characteristics (socket segmented capacity, switch making and breaking capacity, leakage protector action time, action current), appearance, action time, dielectric strength

Testing standards:

1 GB16915.1-2014 Switches for household and similar fixed electrical installations Part 1: General requirements

2. GB16917.1-2014 Residual current operated circuit breakers (RCBOs) with overcurrent protection for household and similar uses Part 1: General rules

3 GB/T 5169.11-2017 Fire hazard testing for electrical and electronic products - Part 11: Glowing wire/basic test methods - Glowing wire flammability test method for finished products (GWEPT)

4. GB/T 169151.1-2014 Switches for household and similar fixed electrical installations - Part 1: General requirements

5. GB 16915.1-2014/19 Switches for household and similar fixed electrical installations - Part 1: General requirements

6 GB/T 10963.1-2005 Electrical Accessories - Circuit Breakers for Overcurrent Protection in Household and Similar Places Part 1: Circuit Breakers for AC Use

7, GB/Z 6829-2008 General Requirements for Residual Current Operated Protective Electrical Appliances

8, GB 2099.1-2008 Household and Similar Use Plug and Socket Outlets Part 1: General Requirements

9, GB10963.1-2005 Fixed Current Carrying Parts Non normal Heat Resistance and Fire Hazard Test

10 GB/T 5169.10-2017 Fire Hazard Testing for Electrical and Electronic Products Part 10: Basic Test Methods for Glowing Wire/Glowing Wire Glowing Wire Devices and General Test Methods

11. GB/T 5169.10-2006 Fire Hazard Testing for Electrical and Electronic Products Part 10: Basic Test Methods for Glowing Wire/Glowing Wire Devices and General Test Methods

12 GB/T 16916.1-2014 Residual Current Operated Circuit Breakers (RCCBs) without Overcurrent Protection for Household and Similar Purposes Part 1: General Rules

13. GB/T 5169.1-2015 Electrical and Electronic Products Fire Hazard Testing Part 1: Fire Test Terminology

14. GB/T 16915.1-2014 Switches for Fixed Electrical Equipment for Household and Similar Purposes Part 1: General Requirements

15 GB/T 16917.1-2014 Residual Current Operated Circuit Breakers (RCBOs) with Overcurrent Protection for Household and Similar Purposes - Part 1: General Rules

16, GB2099.1-2008 Household and Similar Purposes - Part 1: General Requirements

17, GB/T5169.11-2017 Electrical and Electronic Products - Fire Hazard Testing - Part 11: Basic Test Methods for Glowing Wire/Glowing Wire - Glowing Wire Flammability Test Method for Finished Products

18 GB16916.1-1997 Residual Current Operated Circuit Breakers (RCCBs) for Household and Similar Purposes without Overcurrent Protection - Part 1: General Rules

19, GB/T 2099.1-2008 Household and Similar Purposes - Part 1: General Requirements

20, GB/T 2209.1-2008 Household and Similar Purposes - Part 1: General Requirements

Testing Process Steps

1. Telephone communication and confirmation of requirements 2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is required