Detection of multiple heat pump units

 Texting Products    |      2024-01-05 10:08:46

Baijian Testing is a third-party testing agency that provides enterprises with relevant CNAS, CMA, CAL and other qualification certification testing reports. We always take the enterprise as the first and customer as the center, carry out testing work under strict procedures, provide customers with product testing and quality control solutions, and wholeheartedly provide scientific and scientific inspection, research and development analysis services for our customers

Report qualifications: CNAS, CMA, CAL, etc.

Testing costs: quoted based on customer needs and experimental complexity

Sample size: selected for sending or visiting based on sample size

Display style: electronic version

Testing cycle: 3-15 working days (expedited)

Testing items:

Freeze drip test, condensate and condensate discharge test, refrigeration capacity, heating capacity, coefficient of performance (COP), maximum refrigeration operation, maximum heating operation, Minimum refrigeration operation, minimum heating operation, heat recovery efficiency (HRE), heat recovery capacity test, energy efficiency ratio (EER), automatic defrosting test

Detection standards:

1. AS/NZS 3823.1.4-2012 Air conditioners and heat pumps - Electrical performance - Part 1.4: Multi unit split air conditioning and heat pump units - Performance testing and evaluation AS/NZS 3823.1.4-2012

2 AS/NZS 3823.1.4:2012 Air conditioners and heat pumps - Electrical performance - Part 1.4: Multi unit split air conditioning and heat pump units - Performance testing and evaluation 6.1

3. AS/NZS 3823.1.4-201 Electrical performance of air conditioners and heat pumps: Part 1.4 Performance and testing methods for multi unit air conditioning units (Australian/New Zealand performance) AS/NZS 3823.1.4-2012

4 AS/NZS 3823.1.4:2012 Air conditioners and heat pumps - Electrical performance - Part 1.4: Multi unit split air conditioning and heat pump units - Performance testing and evaluation Targeted quotation

4. Both parties confirm, sign the contract, and start the experiment

5. Complete the experiment: The testing cycle (can be expedited) may vary according to the sample and its testing items/methods, and can consult engineers

6. Issue a testing report and provide post service